Hybrid Simulation for Value Stream Mapping to Improve the Environmental Performance of the Construction Phase

Abstract: The environmental impact assessment of the construction phase is often not fully considered compared to other phases of the project life cycle. Previous studies on environmental impact reduction have often focused on technical aspects rather than organisational aspects. The value stream mapping (VSM) method has been extended to capture and improve environmental performance by systematically adopting lean methods in the manufacturing process. However, in the construction field, this approach encounters difficul… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
1
1
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 11 publications
0
2
0
Order By: Relevance
“…The use of VSM provides opportunities to identify production wastes and achieve improvement in the process. VSM can be linked with environmental metrics to identify the existing problems that affect environmental performance (Nguyen & Sharmak, 2022). Normally, VSM is applied on levels; starting with the current VSM, which shows the current situation and the existing bottlenecks and wastes in the process, then the future VSM, which aims to integrate changes in the process to provide improvements and waste elimination, and then, the frequent (normally yearly) VSM that aims to evaluate the progress based on the recommendations of the future VSM.…”
Section: Research Methods and Proposed Frameworkmentioning
confidence: 99%
“…The use of VSM provides opportunities to identify production wastes and achieve improvement in the process. VSM can be linked with environmental metrics to identify the existing problems that affect environmental performance (Nguyen & Sharmak, 2022). Normally, VSM is applied on levels; starting with the current VSM, which shows the current situation and the existing bottlenecks and wastes in the process, then the future VSM, which aims to integrate changes in the process to provide improvements and waste elimination, and then, the frequent (normally yearly) VSM that aims to evaluate the progress based on the recommendations of the future VSM.…”
Section: Research Methods and Proposed Frameworkmentioning
confidence: 99%
“…For instance, SDM is used to investigate the LC-BIM intricate relationships among people during quantity surveying [51]. Nguyen and Sharmak used SDM to evaluate environmental performance, demonstrating how Lean methods and techniques like the Last Planner System (LPS) and Poka-Yoke reduce processing time and CO2 emissions [52]. Meshref et al proposed a decision-making framework based on SDM for managing construction material waste throughout the life cycles of industrial projects, integrating BIM and Lean design into the design phase [53].…”
Section: System Dynamics Applications In Lean Construction Researchmentioning
confidence: 99%