2014
DOI: 10.1109/tvcg.2014.2303092
|View full text |Cite
|
Sign up to set email alerts
|

Hybrid Rendering with Scheduling under Uncertainty

Abstract: As scientific data of increasing size is generated by today’s simulations and measurements, utilizing dedicated server resources to process the visualization pipeline becomes necessary. In a purely server-based approach, requirements on the client-side are minimal as the client only displays results received from the server. However, the client may have a considerable amount of hardware available, which is left idle. Further, the visualization is put at the whim of possibly unreliable server and network condit… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2016
2016
2018
2018

Publication Types

Select...
2
1
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 28 publications
(21 reference statements)
0
3
0
Order By: Relevance
“…The waiting time of subsequent jobs is obviously prolonged, thus reducing system resource utilization and throughput rate. To overcome this disadvantage, a short job priority scheduling strategy [6] was proposed; however, this method might delay a large job to arrive at the earliest time, which can cause job scheduling unfairness. The FirstFit strategy aims to evaluate jobs in the queue and then scheduling the first job with available resources, whereas the BestFit strategy aims to determine the job with the maximum resource satisfaction in the present system [7].…”
Section: State Of the Artmentioning
confidence: 99%
“…The waiting time of subsequent jobs is obviously prolonged, thus reducing system resource utilization and throughput rate. To overcome this disadvantage, a short job priority scheduling strategy [6] was proposed; however, this method might delay a large job to arrive at the earliest time, which can cause job scheduling unfairness. The FirstFit strategy aims to evaluate jobs in the queue and then scheduling the first job with available resources, whereas the BestFit strategy aims to determine the job with the maximum resource satisfaction in the present system [7].…”
Section: State Of the Artmentioning
confidence: 99%
“…The render farm with a pool of finite rendering resources receives the rendering jobs, chooses appropriate resources according to the demands of rendering users and scheduling rendering jobs according to some policies. Generally speaking, the research spot is focus on optimizing and design of scheduling policy [9,26,19]. But many issues are based the on the premise of obtaining the application running time in advance or have not a-priori knowledge on execution time prediction [17], which will negatively impacts the efficiency of scheduling policy, especially for the static policy from the view of system.…”
Section: Introductionmentioning
confidence: 99%
“…Remote rendering has also been employed for scientific data (volume rendering) (Tamm & Krüger, 2014). The authors used hybrid rendering to attenuate the network latency.…”
Section: Related Workmentioning
confidence: 99%