2015
DOI: 10.3901/jme.2015.20.027
|View full text |Cite
|
Sign up to set email alerts
|

Hybrid Estimation of Distribution Algorithm for Solving the Stochastic Job Shop Scheduling Problem

Abstract: 摘要:提出一种混合分布估计算法用于求解具有随机工时的 Job shop 调度问题。建立随机 Job shop 调度问题(Stochastic Job shop scheduling problem, SJSSP)数学模型并给出随机期望值模型的评价方法。为提高种群多样性,将(μ+λ)-进化策略

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 6 publications
(8 reference statements)
0
4
0
Order By: Relevance
“…To optimize the SJSSP, the HEDA proposed by Xiao et al [34] is adopted. To enhance the population diversity of EDA [35], the recombination process and (µ + λ) selection method of (µ + λ) − ES [36] are combined with EDA.…”
Section: Framework Of Hedamentioning
confidence: 99%
See 2 more Smart Citations
“…To optimize the SJSSP, the HEDA proposed by Xiao et al [34] is adopted. To enhance the population diversity of EDA [35], the recombination process and (µ + λ) selection method of (µ + λ) − ES [36] are combined with EDA.…”
Section: Framework Of Hedamentioning
confidence: 99%
“…To enhance population diversity and avoid premature convergence in the evolutionary process of the EDA, a recombination method based on the inherit ratio of parent operation is used [34].…”
Section: Recombination and Selectionmentioning
confidence: 99%
See 1 more Smart Citation
“…The production task sorting of an integrated job-shop with multiple production lines (MPLIJS) can be equivalent to a complex combinatory optimization problem. During the production planning, the job-shop should give fully consideration to the production technique and organization for the products [15][16][17][18]. Abdelmaguid [19] summarized the production task sorting and adjustment MPLIJS as the operation sequence update of the integrated job-shop with multi-channel buffer zones under the just-in-time production model, and took production load balancing and material consumption levelling as the goals of job-shop production control.…”
Section: Introductionmentioning
confidence: 99%