“…Moreover, as the city power load is increasing, the capacity of grid need to be expanded, despite that the overhead AC lines have already occupied much transmission space. In a word, a new transmission approach is needed to solve these and other problems, the DC transmission, which is being used in several projects [30], [31]- [32], and [33]- [34]. Switching surges, for example, are the serious transient over voltages for the high voltage transmission lines.…”