2011
DOI: 10.1016/j.fusengdes.2011.02.019
|View full text |Cite
|
Sign up to set email alerts
|

High voltage power supplies for ITER RF heating and current drive systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
5
0

Year Published

2011
2011
2020
2020

Publication Types

Select...
7
2

Relationship

3
6

Authors

Journals

citations
Cited by 15 publications
(5 citation statements)
references
References 7 publications
0
5
0
Order By: Relevance
“…Four out of the nine HVPS units [3] are supplied by the Indian Domestic Agency (INDA), and the five other units are to be procured by the IO Central Team (IO-CT). INDA has procured a HVPS unit as part of the RF source R&D program.…”
Section: High Voltage Power Supplies (Hvps)mentioning
confidence: 99%
“…Four out of the nine HVPS units [3] are supplied by the Indian Domestic Agency (INDA), and the five other units are to be procured by the IO Central Team (IO-CT). INDA has procured a HVPS unit as part of the RF source R&D program.…”
Section: High Voltage Power Supplies (Hvps)mentioning
confidence: 99%
“…The EC high voltage power supplies [4][5][6] consist of a main power supply (MHVPS, 55 kV/90 A, up to 1 kHz modulation capability), body power supply (BPS, 35 kV, up to 5 kHz modulation capability) and anode power supply for the triode gyrotrons (APS, 40 kV, up to 5 kHz modulation capability). Each MHVPS generates sufficient electrical power for 2 MW microwave power source, with either one supply connected to two 1 MW or one 2 MW gyrotrons, whereas all gyrotrons have their own BPS (and APS for the 8 MW procured by Japan).…”
Section: Power Suppliesmentioning
confidence: 99%
“…The Ie high voltage power supplies [4] are procured by Indian Domestic Agency (INDA) and are laid out at 2 levels: The fIrst level is occupied by the transformers while the space just above it, on the second level, is occupied by the HV electronic switching units & fIlters. The equipment size is to be defIned during the ongoing preliminary design phase which ends in June, 2012.…”
Section: High Voltage Power Supplies Integrationmentioning
confidence: 99%