2003
DOI: 10.1063/1.1627257
|View full text |Cite
|
Sign up to set email alerts
|

High-Temperature Furnace Systems for Realizing Metal-Carbon Eutectic Fixed Points

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
15
0

Year Published

2006
2006
2016
2016

Publication Types

Select...
5
2

Relationship

1
6

Authors

Journals

citations
Cited by 12 publications
(15 citation statements)
references
References 1 publication
0
15
0
Order By: Relevance
“…NRC and VNIIOFI used a high-temperature blackbody furnace (the HTBB3500 made by VNIIOFI) for melting the cells [44,45]. PTB, NIM, CEM, NMIK (and NPL for the relative measurements) used a Chino IR-R80 furnace [46], and NIST and NMIA used a Thermogauge furnace [47]. LNE-Cnam used both a Chino IR-R80 and a VNIIOFI HTBB3200 furnace (with Cell C and Cell D in different furnaces), and used a homebuilt 3-zone furnace for the Cu cells.…”
Section: Furnace Effectmentioning
confidence: 99%
“…NRC and VNIIOFI used a high-temperature blackbody furnace (the HTBB3500 made by VNIIOFI) for melting the cells [44,45]. PTB, NIM, CEM, NMIK (and NPL for the relative measurements) used a Chino IR-R80 furnace [46], and NIST and NMIA used a Thermogauge furnace [47]. LNE-Cnam used both a Chino IR-R80 and a VNIIOFI HTBB3200 furnace (with Cell C and Cell D in different furnaces), and used a homebuilt 3-zone furnace for the Cu cells.…”
Section: Furnace Effectmentioning
confidence: 99%
“…The HTFP cells were installed in an IR-R80 CHINO furnace [19].The furnace was baked, before the installation of the cells, with an Ar and He purge for about 1 h, at approximately 2300 K, for the Co-C, Pt-C and Ru-C cells and at 2800 K in the case of the Re-C. The cells were installed in the furnace wrapped in graphite felt (a different wrap for each cell).…”
Section: (C) Measurements At Cem (I) Operational Conditions and Furnamentioning
confidence: 99%
“…The furnace used for the measurements was a Nagano VR10-A2 (similar to the one described in [19]). For each fixed-point cell, the furnace was baked according to the protocol supplied with the cells on the day before the fixed-point cell installation and measurement.…”
Section: (D) Measurements At Ptb (I) Operational Conditions and Furnamentioning