Proceedings of SPE/ICoTA North American Coiled Tubing Roundtable 1997
DOI: 10.2523/38419-ms
|View full text |Cite
|
Sign up to set email alerts
|

High Pressure Coiled Tubing Job Prepares Gulf Coast Well

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2003
2003
2003
2003

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…11,12 After removing the blowout preventers (BOPs) and installing and pressure testing the wellhead tree, coiled tubing was run into the packer region, and the top of the wireline plug was cleaned. The lower portion of the tubing was displaced back to ZnBr 2 brine to place the wellbore in an estimated underbalance of 1,000 psi.…”
Section: Completion Operationsmentioning
confidence: 99%
“…11,12 After removing the blowout preventers (BOPs) and installing and pressure testing the wellhead tree, coiled tubing was run into the packer region, and the top of the wireline plug was cleaned. The lower portion of the tubing was displaced back to ZnBr 2 brine to place the wellbore in an estimated underbalance of 1,000 psi.…”
Section: Completion Operationsmentioning
confidence: 99%