2022
DOI: 10.14710/mkts.v28i1.32121
|View full text |Cite
|
Sign up to set email alerts
|

Hierarchy of Obstacles to Application of Design Build Methods in Road Infrastructure Project Procurement : A Delphi Study

Abstract: Currently the procurement of road infrastructure projects in Indonesia is mostly carried out using Design Bid Build (DBB), in which the project planning and construction processes are contracted separately. Although this method is well known in its implementation, the long procurement period often results in the slow procurement of infrastructure projects. As an alternative to the procurement method is the Design Build method. This method is believed providing many advantages compared to traditional methods. H… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(4 citation statements)
references
References 10 publications
0
4
0
Order By: Relevance
“…The participants were asked to reconsider and re-evaluate their answers by answering “yes” or “no” to the questions. An agreement measurement approach of “yes” or “no” in the research area of construction was also employed by Dewi (2013). A review of a wide range of Delphi studies revealed that there are different methods for measuring consensus (Sourani and Sohail, 2015).…”
Section: Methodsmentioning
confidence: 99%
See 3 more Smart Citations
“…The participants were asked to reconsider and re-evaluate their answers by answering “yes” or “no” to the questions. An agreement measurement approach of “yes” or “no” in the research area of construction was also employed by Dewi (2013). A review of a wide range of Delphi studies revealed that there are different methods for measuring consensus (Sourani and Sohail, 2015).…”
Section: Methodsmentioning
confidence: 99%
“…Civil construction projects in Indonesia are frequently criticized by the stakeholders because of low-quality results (Mubin and Latief, 2019), such as poor road conditions, which are generally far from satisfactory (Dewi, 2013). Therefore, expectedly, a government program was launched to improve the quality of road projects.…”
Section: Current Scenario Of Road Construction Projects In Indonesiamentioning
confidence: 99%
See 2 more Smart Citations