Heat flux estimation from borehole temperatures acquired during logging while tripping: a case study with the sea floor drill rig MARUM-MeBo

Abstract: During trip out of the drill string at the end of a drilling operation (logging while tripping) borehole temperatures can be measured without the need for additional operational time. A simple interpretation of the measured borehole temperatures is difficult due to the interfering influences of the drilling operations, mainly due to flushing the borehole during drilling. In this study, we present borehole temperature data from drilling campaigns with the sea floor drill rig MARUM-MeBo200 at the Danube Deep Sea… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(1 citation statement)
references
References 31 publications
0
1
0
Order By: Relevance
“…Cutting off the release of high stress along the floor is an effective method to control the extrusion floor heave. The construction position of the stress-relief boreholes is generally in two ribs or the floor, and it is more common to use two ribs for the stress-relief boreholes, because there are defects in the construction of floor boreholes, such as difficulty in discharging slag and low efficiency [60]. The construction boreholes in roadway ribs is taken as an example: the effect of stress regulation and floor heave control on roadway floors was studied by adjusting the boreholes' angle.…”
Section: Borehole Angle θ Bmentioning
confidence: 99%
“…Cutting off the release of high stress along the floor is an effective method to control the extrusion floor heave. The construction position of the stress-relief boreholes is generally in two ribs or the floor, and it is more common to use two ribs for the stress-relief boreholes, because there are defects in the construction of floor boreholes, such as difficulty in discharging slag and low efficiency [60]. The construction boreholes in roadway ribs is taken as an example: the effect of stress regulation and floor heave control on roadway floors was studied by adjusting the boreholes' angle.…”
Section: Borehole Angle θ Bmentioning
confidence: 99%