2021
DOI: 10.1109/mpe.2021.3072816
|View full text |Cite
|
Sign up to set email alerts
|

Harnessing the Full Potential of Clean Energy: The Role of Southern California's Utility Distributed Energy Resource Pilots

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…In bears mentioning at this point, that the CSOM tool's ability to incorporate these types of grid capacity metrics was largely contingent upon the public availability of the requisite data. Within California, a 2014 Public Utilities Commission decision mandated that all of the state's investor-owned utilities generate and make publicly accessible circuit capacity metrics, explicitly for the purpose of renewable energy integration planning (Mehr et al, 2021). In other states and regions however, where utilities have not been similarly compelled by local regulatory authorities to create and disseminate these types of data, it is likely that they will be challenging to obtain.…”
Section: Measuring Circuit Level Pv Integration Capacitiesmentioning
confidence: 99%
“…In bears mentioning at this point, that the CSOM tool's ability to incorporate these types of grid capacity metrics was largely contingent upon the public availability of the requisite data. Within California, a 2014 Public Utilities Commission decision mandated that all of the state's investor-owned utilities generate and make publicly accessible circuit capacity metrics, explicitly for the purpose of renewable energy integration planning (Mehr et al, 2021). In other states and regions however, where utilities have not been similarly compelled by local regulatory authorities to create and disseminate these types of data, it is likely that they will be challenging to obtain.…”
Section: Measuring Circuit Level Pv Integration Capacitiesmentioning
confidence: 99%
“…The first dimension that leads to traditional energy securitization is the issue of availability (Mehr et al, 2021). It involves aspects of supply and demand for resources from the point of view of importers and exporters.…”
Section: The Huge Potential Of Clean Energymentioning
confidence: 99%
“…Inverter-based resources (IBRs) are increasingly deployed to accelerate the green transition of electric power grids [1]. To accommodate the proliferation and even 100% IBRs, the gridforming (GFM) technology emerges as a promising solution [2], [3].…”
Section: Introductionmentioning
confidence: 99%