“…The construction of the shaft and cross-passage of Sijiqing Station will certainly affect the normal use of the airport railway in the western suburbs. Therefore, to meet the requirements of the existing railway roadbed and rail deformation control values (Table 1) (China Railway Cooperation, 2014;China Railway Cooperation, 2019), the technical measures of line reinforcement and stratum reinforcement (Wang et al, 2019;Li et al, 2022;Nakajima et al, 2022), as well as reasonable construction methods of shafts and cross-passageways should be adopted (Song et al, 2018;Lu et al, 2019;Wu et al, 2019;Zhang et al, 2021;Ma et al, 2022).…”