2018
DOI: 10.1049/iet-opt.2016.0165
|View full text |Cite
|
Sign up to set email alerts
|

Greening big data networks: velocity impact

Abstract: I IP WDM Wprocessing velocity of big data into two modes: expedited-data processing mode and relaxed-data processing mode. Expedited-data demands higher amount of computational resources to reduce the execution time compared to the relaxed-W M I L P MILP modes at strategic locations, dubbed processing nodes (PNs), built into the network along the path from the data source to the destination. During the processing of big data, the extracted information from the raw traffic is smaller in volume compared to the o… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

1
26
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
5
2
1

Relationship

3
5

Authors

Journals

citations
Cited by 42 publications
(28 citation statements)
references
References 22 publications
1
26
0
Order By: Relevance
“…However, the workload capacity is large enough if a DC is built at core node p. Note that, the model implements a consolidation process by processing as many Chunks as possible within the same server to minimize the NPC and number of active servers. 6) PNs and DCs storage constraints (19) …”
Section: Power Consumption Of Optical Switch Installed At Node I N (Wmentioning
confidence: 99%
See 2 more Smart Citations
“…However, the workload capacity is large enough if a DC is built at core node p. Note that, the model implements a consolidation process by processing as many Chunks as possible within the same server to minimize the NPC and number of active servers. 6) PNs and DCs storage constraints (19) …”
Section: Power Consumption Of Optical Switch Installed At Node I N (Wmentioning
confidence: 99%
“…Constraint (19) represents the size of Chunks in Gb stored in PN p. Constraint (20) ensures that the total data stored in PN p does not exceed the storage capacity of that PN. H is a large enough unitless number to guarantee that there is no storage capacity limitation at the DCs.…”
Section: Power Consumption Of Optical Switch Installed At Node I N (Wmentioning
confidence: 99%
See 1 more Smart Citation
“…An IP over DWDM core network is used to demonstrate communication between multiple data centres located in multiple cities with over 100 km of optical fibre links as shown in Figure 4 [20]- [29]. Each core node is 100 Gbps MRV/ADVA DWDM node.…”
Section: Architecture Implementationmentioning
confidence: 99%
“…The energy consumption of clouds and data centers is contributing much to the total cost and power consumption in the Information and Communication Technology (ICT) field. That is why a lot of effort is being put forward now to explore alternatives that are more energy efficient and still as powerful [2][3][4][5][6][7][8][9][10][11]. One approach that is being actively evaluated is distributed service providers or the installation of mini data centers close to end users' level.…”
mentioning
confidence: 99%