Proceedings of Annual International Conference and Exhibition 2002
DOI: 10.2523/79157-ms
|View full text |Cite
|
Sign up to set email alerts
|

Good Engineering Practices Achieve a 30-Fold Increase in Injection Rates in Selected Niger Delta Reservoirs

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2005
2005
2005
2005

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Key points of successful implementation of pressure maintenance scheme by water flooding has been examined in a separate paper. 11 Another factor, which has been found to promote screen collapse, is premature bridging. This often occurs in high rate water pack or gravel packing operations, opposite a thief zone where a sand dune continues to be built up during transport due to rapid fluid loss until the velocity in the annulus increases to the critical settling velocity of the solid gravel particles in the carrier fluid.…”
Section: Bmentioning
confidence: 99%
“…Key points of successful implementation of pressure maintenance scheme by water flooding has been examined in a separate paper. 11 Another factor, which has been found to promote screen collapse, is premature bridging. This often occurs in high rate water pack or gravel packing operations, opposite a thief zone where a sand dune continues to be built up during transport due to rapid fluid loss until the velocity in the annulus increases to the critical settling velocity of the solid gravel particles in the carrier fluid.…”
Section: Bmentioning
confidence: 99%