2015
DOI: 10.1016/j.is.2015.03.007
|View full text |Cite
|
Sign up to set email alerts
|

GoBIS: An integrated framework to analyse the goal and business process perspectives in information systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
17
0
2

Year Published

2016
2016
2022
2022

Publication Types

Select...
6
2
1

Relationship

2
7

Authors

Journals

citations
Cited by 24 publications
(26 citation statements)
references
References 14 publications
0
17
0
2
Order By: Relevance
“…For perceived usefulness, the averages obtained from the descriptive statistics indicate that the PU of the iStar2ca guidelines (a value of 3,8) is higher than the PU of their own subjective criteria (3,5). For perceived ease of use, we found that the subjects found the iStar2ca guidelines easier to apply (3,7) than their own criteria (3,5). For intention to use, the results were positive for the application of the iStar2ca guidelines (3,6 versus 3,3).…”
Section: Subject Perceptionsmentioning
confidence: 98%
See 1 more Smart Citation
“…For perceived usefulness, the averages obtained from the descriptive statistics indicate that the PU of the iStar2ca guidelines (a value of 3,8) is higher than the PU of their own subjective criteria (3,5). For perceived ease of use, we found that the subjects found the iStar2ca guidelines easier to apply (3,7) than their own criteria (3,5). For intention to use, the results were positive for the application of the iStar2ca guidelines (3,6 versus 3,3).…”
Section: Subject Perceptionsmentioning
confidence: 98%
“…In this case, the CATO---BE model should contain the MAS---IS such that: (1) the MAS---IS's communicative event (CAS---IS) is specified in the CATO---BE as CTO---BE; (2) the CAS---IS's primary role is specified in the CATO---BE as CTO---BE's primary role; (3) (1)' 4.5 evolCA procedure: evolution scenario procedure 127…”
mentioning
confidence: 99%
“…us, to link business goal to business process models, they define a set of mapping rules from GRL to UCM and other mapping rules from UCM to BPMN. (iii) Ruiz et al [24] propose a framework that integrates two methods: i * which is a goal-oriented modeling method and communication analysis (CA) which is a communication-oriented business process modeling method. To achieve their goal, they use an intermediate reference ontology named FRISCO.…”
Section: Research Question 1: Alignment Between Business Requirement mentioning
confidence: 99%
“…A estrutura do Sistema de Informação proposta na arquitetura EasyBPMS é baseada no padrão arquitetural MVC, pois muitos projetos de sistema seguem esse padrão de design [10] A notação BPMN é um padrão de modelagem de processos e é utilizada por diferentes motores de processo [11].…”
Section: View -Contém As Classes Que Representam a Interface Do Usuárunclassified