2019
DOI: 10.1007/s11204-019-09558-x
|View full text |Cite
|
Sign up to set email alerts
|

Geotechnical Geo-Information System of Astana

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…Secondly, the main distinguishing feature of this work from the previous studies [10,11,24,25,29,31] is the creation of a geotechnical map that was built for the driven piles. According to the geological structure of the foundations, the optimal variations in the pile length for each city zone were determined.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…Secondly, the main distinguishing feature of this work from the previous studies [10,11,24,25,29,31] is the creation of a geotechnical map that was built for the driven piles. According to the geological structure of the foundations, the optimal variations in the pile length for each city zone were determined.…”
Section: Discussionmentioning
confidence: 99%
“…In order to determine the above reasons and soil characteristics, it is often necessary to conduct additional soil examinations, which in general will lead to an increase in the cost of construction and exploration work [27]. In this case, it became necessary to create a geotechnical base for the city of Nur-Sultan, which allows digitalizing the existing data of engineering and geological surveys to this day and is able to preliminarily determine the vertical profiles of soil layers using existing boreholes data [28,29]; thus, contribute to a more accurate determination of the pile length and its sufficient bearing capacity.…”
Section: Introductionmentioning
confidence: 99%
“…The initial information used in the program is divided into two main sections [14]. The first section includes fixed datasets, which are informational materials that come directly with the program.…”
Section: Methodology For Creating a Geoinformation Databasementioning
confidence: 99%