“…In fact, this period corresponds to a big increase of human interference in the channel, with an intensification of in-stream mining in almost the entire channel (Beaudelin, 1989;Jantzi et al, 2017b). In parallel, this has been the subject of heavy bank protections to stabilize the river (Valette et al, 2014). During this time, the channel was also significantly incised, leading to an outcrop of the bedrock.…”