2018
DOI: 10.1007/s10749-018-0965-6
|View full text |Cite
|
Sign up to set email alerts
|

Geodetic Monitoring of Large-Span Underground Facilities During Construction of the Rogun Hydroelectric Power Station

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…After setting the basic parameters such as the number of neurons in the hidden layer, target error, learning rate and maximum training times, and normalizing the input data, the KTH component xnk of the NTH input variable enters the input layer of the BP neural network. The product of xnk, the weight wnh between the input layer and the hidden layer of the neural network, and the threshold θ between the input layer and the hidden layer of the neural network are accumulated into the hidden layer of the BP neural network, and the output hn of the hidden layer is obtained after the calculation of the transfer function f(x) of the BP neural network [13][14].…”
Section: Model Buildingmentioning
confidence: 99%
“…After setting the basic parameters such as the number of neurons in the hidden layer, target error, learning rate and maximum training times, and normalizing the input data, the KTH component xnk of the NTH input variable enters the input layer of the BP neural network. The product of xnk, the weight wnh between the input layer and the hidden layer of the neural network, and the threshold θ between the input layer and the hidden layer of the neural network are accumulated into the hidden layer of the BP neural network, and the output hn of the hidden layer is obtained after the calculation of the transfer function f(x) of the BP neural network [13][14].…”
Section: Model Buildingmentioning
confidence: 99%
“…The generator hall of the Rogun hydroelectric power plant ( Fig. 1) possesses an internal width of 21 m, height 70 m, and length 220 m. A compartment containing the transformers with internal width of 19 m, height 37 m, and length 182 m is situated parallel to the generator hall 63 m away measured along the axes [1].…”
mentioning
confidence: 99%