Geodesic Monitoring of Large-Span Constructions With Spatial Metal Structure

Abstract: The article draws the estimation of geodetic measurement results and conclusions, obtained at observation of deformations during the construction and exploitation of large span structure with bridging of space shell type, located on the territory with hazardous natural and seismic processes and hot climate. On the basis of measurement results of the vertical and horizontal deformation constituents the analysis of actual behavior of the constructions in these conditions was performed. Estimating the deformation… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…After analyzing the tasks of the operational stage [22][23][24][25][26][27][28][29][30][31][32][33][34][35][36][37][38][39][40], it can be noted that to solve most tasks, the requirements for LOD and LOI must correspond to a high level. Although the requirements for LOD, LOI and LOA may be low for some tasks, it is recommended that the development of requirements proceed from the perspective of using AIM to solve a set of operational tasks and determine LOD, LOI and LOA.…”
Section: Production Tasks At Operation Stagementioning
confidence: 99%
“…After analyzing the tasks of the operational stage [22][23][24][25][26][27][28][29][30][31][32][33][34][35][36][37][38][39][40], it can be noted that to solve most tasks, the requirements for LOD and LOI must correspond to a high level. Although the requirements for LOD, LOI and LOA may be low for some tasks, it is recommended that the development of requirements proceed from the perspective of using AIM to solve a set of operational tasks and determine LOD, LOI and LOA.…”
Section: Production Tasks At Operation Stagementioning
confidence: 99%