2011 IEEE Trondheim PowerTech 2011
DOI: 10.1109/ptc.2011.6019441
|View full text |Cite
|
Sign up to set email alerts
|

Generation expansion planning in the age of green economy

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
18
0

Year Published

2013
2013
2019
2019

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 17 publications
(20 citation statements)
references
References 0 publications
0
18
0
Order By: Relevance
“…Besides, from the market perspective, similar considerations would hold for the modeling of all types of strategic behaviors of market competitors and the potential resulting equilibria as in [21]. Hence, in many of the previous studies, network effects which may be of less importance, have not been explicitly included (e.g., in the European context as discussed in [21] and [22]). Other cases without modeling network effects include short-term models [23,24] and longterm models [10].…”
Section: Model Assumptionsmentioning
confidence: 99%
“…Besides, from the market perspective, similar considerations would hold for the modeling of all types of strategic behaviors of market competitors and the potential resulting equilibria as in [21]. Hence, in many of the previous studies, network effects which may be of less importance, have not been explicitly included (e.g., in the European context as discussed in [21] and [22]). Other cases without modeling network effects include short-term models [23,24] and longterm models [10].…”
Section: Model Assumptionsmentioning
confidence: 99%
“…The answers to these types of questions are useful to better coordinate a conventional synchronous generator fleet for the variable wind power generation. Also, the answers can contribute to developing methods for planning the power generation expansion towards lowcarbon economy [13,14]. Specifically, the investigation is based on the total fault injected energy, which is the additional energy injected into the power system during the fault period.…”
Section: Introductionmentioning
confidence: 99%
“…As the in-service life of electric power infrastructures normally span over several decades, a "carbon lock-in" effect would arise if the system were built up. Therefore, there is a growing consensus that changes should be made in planning methods to achieve the delivery of low-carbon electric power systems [3]- [6].…”
Section: Introductionmentioning
confidence: 99%
“…Most of the exploratory studies concerning the above issue generally focused on the generation side [4]- [6]. This situation is changed with the advent of distributed generation (DG).…”
Section: Introductionmentioning
confidence: 99%