2019
DOI: 10.3390/en12132492
|View full text |Cite
|
Sign up to set email alerts
|

Generation Expansion Planning Based on Dynamic Bayesian Network Considering the Uncertainty of Renewable Energy Resources

Abstract: In generation expansion planning, sustainable generation expansion planning is gaining more and more attention. Based on the comprehensive consideration of generation expansion planning economics, technology, environment, and other fields, this paper analyzes the sustainable development of power supply planning evaluation indicators and builds a multi-objective generation expansion planning decision model considering sustainable development. According to the target variables in the model, the variables such as… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 22 publications
(35 reference statements)
0
2
0
Order By: Relevance
“…This key point is coordination and interaction between the transmission and distribution systems that in [36] GEP problem is regarded with this criterion. Additionally, in [37] is used a new way which is called Bayesian network for the dynamic behavior of the system with considering uncertainties of renewable power plants in a multi-objective generation expansion planning decision model regarding permanent development. Because of the changeable output of renewable energy resources, considering flexibility requirements with respect to the power system is an important issue.…”
Section: Introductionmentioning
confidence: 99%
“…This key point is coordination and interaction between the transmission and distribution systems that in [36] GEP problem is regarded with this criterion. Additionally, in [37] is used a new way which is called Bayesian network for the dynamic behavior of the system with considering uncertainties of renewable power plants in a multi-objective generation expansion planning decision model regarding permanent development. Because of the changeable output of renewable energy resources, considering flexibility requirements with respect to the power system is an important issue.…”
Section: Introductionmentioning
confidence: 99%
“…In addition, there are various objective functions such as minimizing generation planning cost [2], maximizing profit in the market [3], maximizing reliability [4,5], minimizing environmental pollution [6], and combination of mentioned objective functions. The problem constraints include load supply, transmission lines, and generators capacity [7], and in some cases, greenhouse gas generation, and also some uncertainties [8,9] have been considered as constraint.…”
Section: Introductionmentioning
confidence: 99%