2017
DOI: 10.1016/j.jclepro.2017.08.068
|View full text |Cite
|
Sign up to set email alerts
|

Game theory based real-time multi-objective flexible job shop scheduling considering environmental impact

Abstract: Production scheduling greatly contributes to optimising the allocation of processes, reducing resource and energy consumption, lowering production costs and alleviating environmental pollution. It is an effective way to progress towards green manufacturing. With the extensive use of the Internet of Things in the manufacturing shop floor, a huge amount of realtime data is created. A typical challenge is how to achieve the real-time data-driven optimisation for the manufacturing shop floor to improve energy effi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
57
0
3

Year Published

2017
2017
2024
2024

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 102 publications
(60 citation statements)
references
References 71 publications
0
57
0
3
Order By: Relevance
“…In addition, the authors' previous study has been conducted on the subject of game theory-based flexible job shop scheduling [25]. This study is different from the authors' previous one as follows.…”
Section: B Game Theory For Schedulingmentioning
confidence: 90%
See 2 more Smart Citations
“…In addition, the authors' previous study has been conducted on the subject of game theory-based flexible job shop scheduling [25]. This study is different from the authors' previous one as follows.…”
Section: B Game Theory For Schedulingmentioning
confidence: 90%
“…Determine an SPNE according to each player's utility using backward induction. The contents of the SPNE solution are described in the authors' previous paper [25].…”
Section: B Experimental Trialsmentioning
confidence: 99%
See 1 more Smart Citation
“…In addition, the WT and makespan of task processing would be reduced by batch production. The process energy intensive can be avoided and thus improve energy efficiency [119][120][121][122][123][124].…”
Section: Scheduling Management and Use For Energy Efficiencymentioning
confidence: 99%
“…This method optimizes not only the operation sequence for reducing idle energy consumption, but also the machine tool selection for decreasing the energy consumption for machining operations. As alternative method to handle unforeseen events during the execution of a schedule (Gong et al, 2016b), a dynamic game theory based two-layer scheduling method was proposed for a flexible job shop (Zhang et al, 2017). Upon a machine's active request for processes during an idle period, the real-time scheduling task pool output a schedule, optimizing the makespan, total workload and energy consumption.…”
Section: Energy-efficient Production Schedulingmentioning
confidence: 99%