2020 28th Mediterranean Conference on Control and Automation (MED) 2020
DOI: 10.1109/med48518.2020.9182853
|View full text |Cite
|
Sign up to set email alerts
|

Gain Scheduled Subspace Predictive Control of a Pressurized Water-type Nuclear Reactor

Abstract: The Leeds Beckett repository holds a wide range of publications, each of which has been checked for copyright and the relevant embargo period has been applied by the Research Services team. We operate on a standard take-down policy. If you are the author or publisher of an output and you would like it removed from the repository, please contact us and we will investigate on a case-by-case basis.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
3

Relationship

2
1

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 18 publications
0
1
0
Order By: Relevance
“…The response and the performance of an NPP differ significantly over its lifespan due to parameter variations, unmodelled dynamics, model-plant mismatch, mechanical vibrations, fuel burn-up and refuelling operations, transmutation of structural materials, hydrogen production and diffusion, and wear and tear of equipments. Thus, a constant gain control strategy designed during the commissioning of an NPP may not be suitable at a later operation stage, or it may even cause an undesirable, unpredictable, or unstable response [32]. The necessity of a precise mathematical model becomes rigid, mostly during retrofitting of advanced controllers in an aged NPP.…”
Section: Introductionmentioning
confidence: 99%
“…The response and the performance of an NPP differ significantly over its lifespan due to parameter variations, unmodelled dynamics, model-plant mismatch, mechanical vibrations, fuel burn-up and refuelling operations, transmutation of structural materials, hydrogen production and diffusion, and wear and tear of equipments. Thus, a constant gain control strategy designed during the commissioning of an NPP may not be suitable at a later operation stage, or it may even cause an undesirable, unpredictable, or unstable response [32]. The necessity of a precise mathematical model becomes rigid, mostly during retrofitting of advanced controllers in an aged NPP.…”
Section: Introductionmentioning
confidence: 99%