2019
DOI: 10.1016/j.aej.2019.12.002
|View full text |Cite
|
Sign up to set email alerts
|

Fuzzy rough bi-level multi-objective nonlinear programming problems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 14 publications
(2 citation statements)
references
References 26 publications
0
2
0
Order By: Relevance
“…The previous articles did not use the approach of operations using α-cut. Other work [46][47][48][49][50].…”
Section: Introductionmentioning
confidence: 99%
“…The previous articles did not use the approach of operations using α-cut. Other work [46][47][48][49][50].…”
Section: Introductionmentioning
confidence: 99%
“…Garai, et al [11], developed a multi-objective multi-item inventory model with fuzzy rough coefficients. Elsisy and Elsayed [12], develop bilevel multi-objective nonlinear programming problem (BMNPP), in which the objective functions have fuzzy nature and the constraints represented as a rough set. Midya and Roy [13], introduced an analysis of the interval programming utilizing rough interval Pandian, et al [14] proposed level-bound method for solving fully fuzzy interval integer transportation problem Ammar and Eljarbi [15] proposed an algorithm for solving fuzzy rough multi-objective integer linear fractional programming problem.…”
Section: Introductionmentioning
confidence: 99%