2015
DOI: 10.1515/ace-2015-0012
|View full text |Cite
|
Sign up to set email alerts
|

Fuzzy Estimation Of Activities Duration In Construction Projects

Abstract: During implementation of construction projects, durations of activities are affected by various factors. Because of this, both during the planning phase of the project as well as the construction phase, managers try to estimate, or predict, the length of any delays that may occur. Such estimates allow for the ability to take appropriate action in terms of planning and management during the execution of construction works. This paper presents the use of the non-deterministic concept for describing the uncertain… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
41
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 21 publications
(41 citation statements)
references
References 4 publications
0
41
0
Order By: Relevance
“…The possibility of analysis and calculation making depends directly on the choice of the mathematical tool. The fuzzy set theory invented by L.A. Zadeh [26] seems a very good, suitable choice, as it is successfully applied in modelling variety of processes in the construction industry [1], [6][7][8], [12], [20][21][22][23]. Considering the type of the input data, modelling linguistic variables with fuzzy numbersaccording to the author's opinion -is justified.…”
Section: Alternative Net Model With a Fuzzy Decision Node The Core Anmentioning
confidence: 99%
See 1 more Smart Citation
“…The possibility of analysis and calculation making depends directly on the choice of the mathematical tool. The fuzzy set theory invented by L.A. Zadeh [26] seems a very good, suitable choice, as it is successfully applied in modelling variety of processes in the construction industry [1], [6][7][8], [12], [20][21][22][23]. Considering the type of the input data, modelling linguistic variables with fuzzy numbersaccording to the author's opinion -is justified.…”
Section: Alternative Net Model With a Fuzzy Decision Node The Core Anmentioning
confidence: 99%
“…Nevertheless finding the probability distribution of any hypothetic event, in a real, single construction project it is very difficult. For these reasons, occupancy of any risk factor is uncertain [6][7], [11], [14][15][16], [18][19][20][21]. The assumption made by the decision maker (the manager) about the probability distribution should make him aware of the negative effects of the divergence between assumptions made and the real circumstances.…”
Section: Introductionmentioning
confidence: 99%
“…▶ the center of gravity method [7] (labeled as A): -the value of the output variable for i fuzzy set, μ(x i ) -the membership function of the output variable for i fuzzy set, i -number of fuzzy set of n fuzzy sets, ▶ the weighted average method modified (labeled as D) where only two fuzzy sets were taken into account: medium always, and the other set with higher predicted μ (μ S or μ L ), then formula (7) is applied. The modification of method B was based on the fact that delays calculated for teaching ANN set of data are represented by three numbers (as shown in tab.…”
Section: Ann Trained With the Set Of Delays Expressed By The Values Omentioning
confidence: 99%
“…The scientific basis for the improvement of PCC performance are similar to those for the other composites. On the one hand, the statistical methods of optimization are developed, the same way as it is observed in theory of structures and managing [16,17]; the advanced methods are employed, like using the artificial neural networks or fuzzy logic [18]. On the other hand, the efficient modification is possible if reliable model of the microstructure formation is available, including such questions as interaction between polymer and cement and creation of continuous polymer film [19].…”
Section: Introductionmentioning
confidence: 99%