“…However, the overlapping parts require a strict, sequential disassembly process, which hinders the potential for architectural flexibility in the scenario of intermediate module removal. Another attempt to optimise installation workflows was reported in the work of Wang et al [79], who proposed a bolted endplate joint located inside the SHS posts (CTC09), tightened with a long twisting tool from the top of the module, similar to the tool required by LD06 connection [54]. The weakness of this connection was in its large number of unique components and tedious welding tasks for pre-attaching the parts.…”