World Congress on Medical Physics and Biomedical Engineering 2006
DOI: 10.1007/978-3-540-36841-0_921
|View full text |Cite
|
Sign up to set email alerts
|

Fully Automatic Calculation of Medical Equipment Down Time Phases

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…The available within the directorate of biomedical engineering at MOH computerized maintenance management system (CMMS) allows to calculate and to report the uptime A and DT for each piece of the available in MOHlocations medical equipment [4] as shown in figure 1. The implemented CMMS also allow to monitor A and DT for a long period of equipment life time for example 4, 5, 6 or more years, and also to monitor the A or DT trends for all equipment of certain model or type as shown in figure 2.…”
Section: Down Time Mesurment and Monitoringmentioning
confidence: 99%
“…The available within the directorate of biomedical engineering at MOH computerized maintenance management system (CMMS) allows to calculate and to report the uptime A and DT for each piece of the available in MOHlocations medical equipment [4] as shown in figure 1. The implemented CMMS also allow to monitor A and DT for a long period of equipment life time for example 4, 5, 6 or more years, and also to monitor the A or DT trends for all equipment of certain model or type as shown in figure 2.…”
Section: Down Time Mesurment and Monitoringmentioning
confidence: 99%