2019
DOI: 10.1016/j.paerosci.2018.11.001
|View full text |Cite
|
Sign up to set email alerts
|

From idea to flight - A review of the Mobile Asteroid Surface Scout (MASCOT) development and a comparison to historical fast-paced space programs

Abstract: Now spanning a time frame of already 10 years, the plan to land a European Lander on an asteroid has finally been accomplished. The first idea was established around 2008 in the framework of the European Marco Polo Assessment, studying the possibility to collect a pristine sample of a Near-Earth Asteroid and returning it back to Earth. The lander named MASCOT (Mobile Asteroid Surface Scout) was proposed to be carried by the main spacecraft, to land on the surface and by the ability to relocate to investigate m… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0
1

Year Published

2019
2019
2021
2021

Publication Types

Select...
6
1

Relationship

5
2

Authors

Journals

citations
Cited by 9 publications
(11 citation statements)
references
References 32 publications
(22 reference statements)
0
10
0
1
Order By: Relevance
“…For a full review of this method and a historical comparison to other fast-paced projects and programs in space showing large similarities to Skunk Works, the 1960s Space Race and Faster Better Cheaper, please refer to [10].…”
Section: Resultsmentioning
confidence: 99%
“…For a full review of this method and a historical comparison to other fast-paced projects and programs in space showing large similarities to Skunk Works, the 1960s Space Race and Faster Better Cheaper, please refer to [10].…”
Section: Resultsmentioning
confidence: 99%
“…1 The lander separation shall be commanded via one redundant channel SR-1. 2 The trajectory of the lander after ejection shall not exceed an ejection cone of ±5 • ( 1 ) SR-1. 3 The lander shall be separated at an altitude of 50-100 m above the asteroid surface SR-1.…”
Section: Customized Solutionsmentioning
confidence: 99%
“…All elements were designed according to ECSS standards for the minimization of misalignment errors and cold welding risk and the total mass of the MSM was < 290 g, including PRM 85 g, HDRM 75 g, UMC 65 g, POM 52 g and harness respectively. The functionality and performance of the MSM has been verified by system level tests (presented in detail in [2]), extensive sub-unit tests (e.g. low temperature or even thermal-vacuum and shock/vibration for the PRM, UMC and POM), as well as in dedicated microgravity campaigns using parabolic flights and drop tower experiments (presented in Sect.…”
Section: System Architecturementioning
confidence: 99%
See 1 more Smart Citation
“…GOSSAMER-1 was brought to EQM (Engineering Qualification Model) status in an intense integration and verification campaign (cf. [64] [246]) leading to TRL5 status [65] (according to [66], cf. [67][68][69][70][71] [232]).…”
Section: Introductionmentioning
confidence: 99%