2018
DOI: 10.1080/01446193.2018.1481985
|View full text |Cite
|
Sign up to set email alerts
|

From Finnish AEC knowledge ecosystem to business ecosystem: lessons learned from the national deployment of BIM

Abstract: Government actors, public agencies, industry and academics have struggled to change the rules of the existing business ecosystem to support the networked practices that were envisioned back in the 1980s with the introduction of Building Information Modelling (BIM). Despite the industry's far-reaching technological capabilities, BIM has primarily assumed productivity improvement by individual firms, which has not lead to a systemic change in the Finnish architecture, engineering and construction (AEC) business … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

1
38
0
2

Year Published

2019
2019
2023
2023

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 54 publications
(44 citation statements)
references
References 26 publications
1
38
0
2
Order By: Relevance
“…An inductive grounded theory approach was applied to the analysis of qualitative data, which have been first coded, identifying key points of the data to be gathered, and then grouped into concepts and categories of concepts that have been finally used for generating the proposed contribution (Suwal & Singh, 2018;Aksenova et al, 2018;Liu, 2017;Kumar, 2013).…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…An inductive grounded theory approach was applied to the analysis of qualitative data, which have been first coded, identifying key points of the data to be gathered, and then grouped into concepts and categories of concepts that have been finally used for generating the proposed contribution (Suwal & Singh, 2018;Aksenova et al, 2018;Liu, 2017;Kumar, 2013).…”
Section: Discussionmentioning
confidence: 99%
“…Interviews have been taped and transcribed (Whyte, 2003). In order to code the interviews, the transcripts were imported in NVivo 12 software (Aksenova et al, 2018) as text files (i.e., *.docx format), organised in cases, which represent the units of observation of the analysis, and then classified by the profile of relevant stakeholders (i.e., designers, accessibility expert, clients, end-users) (Table 4). During the interview analysis, sentences or group of sentences were assigned to primary codes.…”
Section: Discussionmentioning
confidence: 99%
“…Em 2018, o Brasil lançou a Estratégia BIM BR (BRASIL, 2018), enquanto vários países já apresentam políticas tornando o uso do BIM obrigatório (ARCHIDAILY, 2018; Edirisinghe, 2015; Kapsalaki, 2017;Paul, 2018). No entanto, a Finlândia, o primeiro pais no mundo com uma política especifica para implementação nacional do BIM, iniciada na década de 1980, apresentou um relatório mostrando que três décadas de implementação do BIM, não trouxeram os ganhos de produtividade esperados (Aksenova et al, 2018).…”
Section: O Problema Da Necessidade Projeto Integrado Para a Implementunclassified
“…Dessa forma, a adoção de software BIM, é beneficiada pela a adoção pela metodologia de projeto integrado. Como mostra o caso finlandês, a adoção de programas BIM por si só não resulta nos benefícios esperados em aumento de produtividade (Aksenova et al, 2018).…”
Section: O Problema Da Necessidade Projeto Integrado Para a Implementunclassified
“…With the introduction of BIM, the innovation paradigm of the construction industry has been changing and upgrading towards an ecological and organic innovation ecosystem [12]. The sustainable development of the AEC industry is not only derived from technological change or policy support, but also depends on the imbedded innovation ecosystem.…”
Section: Introductionmentioning
confidence: 99%