Volume 3: Pipeline and Riser Technology 2012
DOI: 10.1115/omae2012-84102
|View full text |Cite
|
Sign up to set email alerts
|

From Design to Installation of the 2nd Generation of Integrated Production Bundle Riser (IPB)

Abstract: As part of the TOTAL E&P Angola (TEPA) PAZFLOR development, two 10” Integrated Production Bundle (IPB) flexible risers have been installed to connect the Pipe-In-Pipe Oligocene loop to the FPSO. While IPB risers have first been implemented on the nearby DALIA development, the PAZFLOR IPB had to accommodate much higher design and operating temperatures. From the on-set of the project, focus was put on improving the design of this second generation of IPB and ensuring that all the lessons lear… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2015
2015
2018
2018

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 0 publications
0
0
0
Order By: Relevance