2014
DOI: 10.1061/(asce)co.1943-7862.0000885
|View full text |Cite
|
Sign up to set email alerts
|

Framework for Work-Space Planning Using Four-Dimensional BIM in Construction Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
30
0
11

Year Published

2018
2018
2023
2023

Publication Types

Select...
4
4
1

Relationship

0
9

Authors

Journals

citations
Cited by 76 publications
(41 citation statements)
references
References 24 publications
0
30
0
11
Order By: Relevance
“…This is particularly important in some construction sites located in central urban areas, where there are constraints regarding the delivery of components or operation of transportation equipment, including working times or number of deliveries per day (König et al 2011). Choi et al (2014) suggested a workspace planning process in a 4D BIM environment that considers characteristics of activity, workspace, and construction plan.…”
Section: D Bim For Managing Eto Prefabricated Building Systemsmentioning
confidence: 99%
See 1 more Smart Citation
“…This is particularly important in some construction sites located in central urban areas, where there are constraints regarding the delivery of components or operation of transportation equipment, including working times or number of deliveries per day (König et al 2011). Choi et al (2014) suggested a workspace planning process in a 4D BIM environment that considers characteristics of activity, workspace, and construction plan.…”
Section: D Bim For Managing Eto Prefabricated Building Systemsmentioning
confidence: 99%
“…Several previous studies have investigated the use of fourdimensional (4D) modelling to support production management in construction such as workspace planning (Choi et al 2014), detection of spatial and temporal conflicts (Kassem et al 2015), testing alternative sequences of tasks (Chau et al 2004), resource utilization management (Wang et al 2004), construction schedules and site space arrangement (Ma et al 2005), site material supply (Yu et al 2016), internal site logistics (Bortolini et al 2019), and analysis of the impacts of conflicts on health and safety (Zhang et al 2015). However, none of those studies have fully addressed the role of logistics management in the integration between the production and delivery of prefabricated building components and site assembly.…”
Section: Introductionmentioning
confidence: 99%
“…For the optimization, the authors used GA. Similar studies and active BIM-ready approaches were presented in [18][19][20], while in [21,22] the BIM's potentials in terms of its further development were presented. A more extensive review of applied active BIM approaches, not only those concerned with tower crane or construction site layout optimization, is given in [23].…”
Section: A Short Overview Of Recent Active Bim Approaches Their Outcmentioning
confidence: 73%
“…Similar approaches are also applicable to more specialised requirements. Choi et al [40] as well as Chavada et al [41] have applied it to the problem of work-space planning and management; in both cases, a single BIM environment was utilised to enable nD modelling and resolve conflicts. Addressing more technical issues, Kim et al developed a framework that enables the dimensional and surface quality assessment of precast concrete elements [42]; as a key part of the work involved primary data collection via laser scanning, the focus of the framework was not BIM per se, but I/O interoperability with a BIM system.…”
mentioning
confidence: 99%