2015
DOI: 10.1061/(asce)is.1943-555x.0000252
|View full text |Cite
|
Sign up to set email alerts
|

Framework for Modeling On-Site Productivity of Preventive Maintenance Activities for Wastewater Collection Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2015
2015
2020
2020

Publication Types

Select...
3
2

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 18 publications
0
1
0
Order By: Relevance
“…CCTV operators travel to inspect sewer pipes at the assigned locations as per the schedule set up by the municipal maintenance department. In general, before beginning the video collection phase, the pipes to be inspected are cleaned in advance by means of flushing equipment, in order to eliminate deposits and obstacles in the pipes which in turn ensures that the conditions for data collection are acceptable [6,7]. Following flushing activities, operators begin set-up work for CCTV data collection on the ground.…”
Section: Cctv Collection Processmentioning
confidence: 99%
“…CCTV operators travel to inspect sewer pipes at the assigned locations as per the schedule set up by the municipal maintenance department. In general, before beginning the video collection phase, the pipes to be inspected are cleaned in advance by means of flushing equipment, in order to eliminate deposits and obstacles in the pipes which in turn ensures that the conditions for data collection are acceptable [6,7]. Following flushing activities, operators begin set-up work for CCTV data collection on the ground.…”
Section: Cctv Collection Processmentioning
confidence: 99%