2009
DOI: 10.3182/20090916-3-br-3001.0031
|View full text |Cite
|
Sign up to set email alerts
|

Fpso and Monobuoy Offloading Operation With a Conventional Shuttle Tanker: Dimensioning of Tugboat Based on Numerical Simulation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0
3

Year Published

2019
2019
2020
2020

Publication Types

Select...
2
1
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 2 publications
0
1
0
3
Order By: Relevance
“…Excessive tension due to vessel motion and environmental load may fail in offloading operation [8]. In this study, the initial design of mooring buoy made for a tanker with 35,000 DWT.…”
Section: Introductionmentioning
confidence: 99%
“…Excessive tension due to vessel motion and environmental load may fail in offloading operation [8]. In this study, the initial design of mooring buoy made for a tanker with 35,000 DWT.…”
Section: Introductionmentioning
confidence: 99%
“…hold on subplot(2,2,2) stairs(Wa,'LineWidth',2),grid xlabel('Прибывшие суда') ylabel('Ожидание в очереди,ч.') subplot(2,2,3) stairs(x2,'LineWidth',2),grid xlabel('Прибывающие суда') ylabel('Время обработки,ч.') subplot(2,2,4) stairs(Pt,'LineWidth',2),grid xlabel('Суда') ylabel('Простои причала,ч.')…”
unclassified
“…subplot(2,2,3) stairs(x2,'LineWidth',2),grid xlabel('Прибывающие суда') ylabel('Время обработки,ч.') subplot(2,2,4) stairs(Pt,'LineWidth',2),grid xlabel('Суда') ylabel('Простои причала,ч.') % ================================ % Оценка вероятностей и времени T i нахождения в порту i судов, с применением % распределения Пуассона.…”
unclassified
“…Entretanto, ao longo das operações, foi-se verificando que em grande número de vezes não era possível a manutenção da posição relativa entre os navios dentro destes limites, e definiu-se, após análises de risco, que para plataformas do tipo SMS, o desalinhamento máximo admitido era de -45º/60º. Esta assimetria é devido ao fato de que o "pente" de risers é instalado em um bordo da plataforma (Petrobras, 2005b (Tannuri et al, 2009d). Em muitas situações, o Sistema DP não possui potência suficiente para esta realocação, e o alívio deve ser interrompido.…”
Section: Desenvolvimento De Controle Para Geração E Absorção Ativa Deunclassified