Abu Dhabi International Petroleum Exhibition &Amp; Conference 2019
DOI: 10.2118/197843-ms
|View full text |Cite
|
Sign up to set email alerts
|

FPSO 4.0: Powering Deepwater Production and Optimizing the Lifecycle Performance of Offshore Rotating Equipment Packages

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
1
1
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 3 publications
0
0
0
Order By: Relevance
“…FPSOs have the highest invest-on yield compared to other platforms, being particularly effective in deep water and ultradeep water as they can be relocated whenever a reservoir is no longer profitable. Generally, current publications involve process design solutions (e.g., Gyllenhammar et al, 2017;Cho et al, 2018), optimization of topside layout modules (e.g., Ku et al, 2014b), topside systems (e.g., Sehgal and Khan, 2020;Reis and Gallo, 2018), or oilfield and well assignment with oil production (e.g., Gupta and Grossmann, 2012;Moolya et al, 2022), and inventory routing (e.g., Assis et al, 2021). Following Kim et al (2017), there are different ways to arrange equipment in an FPSO topside, since owners can make several operational requirements due to different philosophies and site characteristics.…”
Section: State Of the Art And Reviewmentioning
confidence: 99%
“…FPSOs have the highest invest-on yield compared to other platforms, being particularly effective in deep water and ultradeep water as they can be relocated whenever a reservoir is no longer profitable. Generally, current publications involve process design solutions (e.g., Gyllenhammar et al, 2017;Cho et al, 2018), optimization of topside layout modules (e.g., Ku et al, 2014b), topside systems (e.g., Sehgal and Khan, 2020;Reis and Gallo, 2018), or oilfield and well assignment with oil production (e.g., Gupta and Grossmann, 2012;Moolya et al, 2022), and inventory routing (e.g., Assis et al, 2021). Following Kim et al (2017), there are different ways to arrange equipment in an FPSO topside, since owners can make several operational requirements due to different philosophies and site characteristics.…”
Section: State Of the Art And Reviewmentioning
confidence: 99%