2019
DOI: 10.3390/w11050944
|View full text |Cite
|
Sign up to set email alerts
|

Formulation and Implementation of Short-Term Optimal Reservoir Operation Schemes Integrated with Operation Rules

Abstract: To narrow the gap between theoretical research and practical application of short-term optimal reservoir power generation operation under uncertain conditions, a comprehensive study is conducted on the formulation, evaluation, and implementation of operation schemes throughout the entire procedure of optimal operation. Firstly, the three implementation modes of the optimal operation scheme are assessed with the post-evaluation method. After the optimal implementation mode is determined, the formulation and imp… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 16 publications
0
3
0
Order By: Relevance
“…Considering space and time inflow correlations [21,40], the recursive function can be transformed into Equations ( 6) and (7).…”
Section: Mldc Model Based On Rcdpmentioning
confidence: 99%
See 1 more Smart Citation
“…Considering space and time inflow correlations [21,40], the recursive function can be transformed into Equations ( 6) and (7).…”
Section: Mldc Model Based On Rcdpmentioning
confidence: 99%
“…Methods including linear programming (LP), dynamic programming (DP), nonlinear programming (NLP), and simulation have been used in the optimization of reservoir operations [2][3][4]. The operation of hydropower reservoirs needs to follow energy generation rules [5][6][7] to increase benefit, and must consider the criteria of reliability, resiliency, and vulnerability [8]. In a centralized operated power system with no timevarying energy price, the economic benefit is often evaluated using the amount of energy generation, and bounds on power generation and reservoir release are set to be constraints.…”
Section: Introductionmentioning
confidence: 99%
“…The short-term optimal operation models were established coupling with the FWFHM (Scheme 1) and the DWFHM (Scheme 3), and the models were solved by IPOA to obtain operation schemes. Meanwhile, the scheme coupling with the FWFHM was replaced by the DWFHM to form Scheme 2, which was implemented in accordance with the water level control mode to obtain the actual operation results [29].The accuracy of IPOA in different schemes was set as 0.0001. The opeartion results are shown in Table 2, Table 3, and Figures 8-13.…”
Section: Case Studymentioning
confidence: 99%