“…An additional test was performed using higher loads (matrix 2) in order to cover a greater region and, principally, to make marks that would be visible under SEM. In this case, a 2 × 3 points matrix was used up to a load of 512 mN (1,2,4,8,16,32,64,128,256, and 512 mN). Loading was applied linearly for 10 s, the maximal load (P max ) was then maintained for 5 s and unloading occurred over a further 10 s.…”