2017
DOI: 10.1016/j.jclepro.2017.01.084
|View full text |Cite
|
Sign up to set email alerts
|

Forecasting number of ISO 14001 certifications in the Americas using ARIMA models

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
14
0
1

Year Published

2017
2017
2023
2023

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 34 publications
(15 citation statements)
references
References 52 publications
0
14
0
1
Order By: Relevance
“…[2] In comparison to Autoregressive Conditional Heteroskedasticity (ARCH) and Generalized Autoregressive Conditional Heteroskedasticity (GARCH), ARIMA produced smallest error in predicting the exchange rate of IDR against USD for the period of January 3 rd , 2000 to July 7 th , 2014. [3] Forecasting using the ARIMA method on ISO 14001 certification data in the Americas and its 13 countries between 1996 and 2015 showed that the prediction results were close to realization.…”
Section: Introductionmentioning
confidence: 86%
See 1 more Smart Citation
“…[2] In comparison to Autoregressive Conditional Heteroskedasticity (ARCH) and Generalized Autoregressive Conditional Heteroskedasticity (GARCH), ARIMA produced smallest error in predicting the exchange rate of IDR against USD for the period of January 3 rd , 2000 to July 7 th , 2014. [3] Forecasting using the ARIMA method on ISO 14001 certification data in the Americas and its 13 countries between 1996 and 2015 showed that the prediction results were close to realization.…”
Section: Introductionmentioning
confidence: 86%
“…Calculating the light intensity, i.e. the AIC value, of each firefly using equation (3). To get the light intensity value, the result value from the objective function evaluation (p,d,q) is required.…”
mentioning
confidence: 99%
“…The study of the diffusion phenomenon of MS standards is not new. Several authors have studied the diffusion of the ISO 9001 (Franceschini et al , 2004; Viadiu et al , 2006; Albuquerque et al , 2007; Chen and Liu, 2009; Cots and Casadesús, 2015; Marimon et al , 2009; Sampaio et al , 2011; Salgado et al , 2016), ISO 14001 (Albuquerque et al , 2007; Casadesús et al , 2008; Viadiu et al , 2006; Qi et al , 2011; Delmas and Montes-Sancho, 2011; Heras-Saizarbitoria et al , 2015; Hikichi et al , 2017; To and Lee, 2014), ISO/TS 16949 (Franceschini et al , 2011) and SA 8000 (Llach et al , 2015) standards. In addition, comparison of these generic MS standards with sectoral standards has been analyzed (Alonso-Almeida et al , 2013; Bernardo, Escalante, Roca and Arbussà, 2017).…”
Section: Literature Reviewmentioning
confidence: 99%
“…Box-Jenkins ARIMA 1 is a simulation of regressive time series models that has become widely utilized in recent years. Many kinds of Box-Jenkins ARIMA have been developed, including the ARMA approach (Rojas et al, 2008;Wang and Lu, 2006;Hwarng, 2001), the ARIMA approach (Hikichi et al, 2017;Petrevska, 2017), seasonal ARIMA (Gharbi et al, 2011;Egrioglu et al, 2009;Tsui et al, 2014), the bivariate model or ARIMA transfer (Sharma and Khare, 2001;Sun and Koch, 2001;Gröger and Rumohr, 2006), and hybrid models (Babu and Reddy, 2014;Egrioglu et al, 2009;Pong et al, 2004). Moreover, some studies have shown interest in the partitioning of the ARIMA family to improve forecasting results (Gray, 1996;Blazsek and Mendoza, 2016;Zhang, 2003;Kambouroudis et al, 2016).…”
Section: Introductionmentioning
confidence: 99%