2006
DOI: 10.1016/j.ejor.2005.02.001
|View full text |Cite
|
Sign up to set email alerts
|

Flowshop scheduling research after five decades

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
123
0
3

Year Published

2008
2008
2016
2016

Publication Types

Select...
7
2
1

Relationship

0
10

Authors

Journals

citations
Cited by 281 publications
(126 citation statements)
references
References 45 publications
0
123
0
3
Order By: Relevance
“…Reisman et al (1997) reviewed practical cases and concluded that the flowshop problem has many real life applications. This applicability of the flowshop is also highlighted in the many exiting reviews from the literature like Framinan et al (2004), Ruiz and Maroto (2005), Hejazi and Saghafian (2005) and Gupta and Stafford (2006). As a matter of fact, once generalized to hybrid flowshops or flexible flowline problems, many production problems can be modeled after a flowshop (Linn and Zhang, 1999;Vignier et al, 1999;Wang, 2005;Quadt and Kuhn, 2007;Ruiz and Vázquez-Rodríguez, 2010;Ribas et al, 2010).…”
Section: Introductionmentioning
confidence: 88%
“…Reisman et al (1997) reviewed practical cases and concluded that the flowshop problem has many real life applications. This applicability of the flowshop is also highlighted in the many exiting reviews from the literature like Framinan et al (2004), Ruiz and Maroto (2005), Hejazi and Saghafian (2005) and Gupta and Stafford (2006). As a matter of fact, once generalized to hybrid flowshops or flexible flowline problems, many production problems can be modeled after a flowshop (Linn and Zhang, 1999;Vignier et al, 1999;Wang, 2005;Quadt and Kuhn, 2007;Ruiz and Vázquez-Rodríguez, 2010;Ribas et al, 2010).…”
Section: Introductionmentioning
confidence: 88%
“…The usual objectives are the minimization of the make-span, flow time, tardiness, lateness, and the number of jobs late. For a review of the general flowshop problem, see [2], and more recently [3]. The application of the flowshop scheduling research can be found in the areas such as chemical process industry and manufacturing systems, especially flexible transfer or assembly lines in which a wide range of parts are manufactured [4].…”
Section: Introductionmentioning
confidence: 99%
“…In the Editorial paper, Gupta and Stafford Jr. (2006) show the development of problem models, as well as solution methods over the past five decades. Taking this into account, it can be observed that the consideration of flow shop problems dealing explicitly with setup times started from the third decade (1975)(1976)(1977)(1978)(1979)(1980)(1981)(1982)(1983)(1984), and researchers became gradually interested in the subject from the fourth decade.…”
Section: Introductionmentioning
confidence: 99%