2016
DOI: 10.1016/j.procs.2016.07.319
|View full text |Cite
|
Sign up to set email alerts
|

Flower Pollination Algorithm Based Optimal Setting of TCSC to Minimize the Transmission Line Losses in the Power System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
17
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 17 publications
(19 citation statements)
references
References 6 publications
0
17
0
Order By: Relevance
“…The problems that the transmission sector of a power system face include large amounts of power loss in the transmission line which is termed as transmission line losses. This issue can be resolved by using the FPA to determine optimal placement of Flexible AC transmission system (FACTS) devices [10], [96]. In addition, optimal power flow problem in power systems, with the use of FPA along with SVC's, real power losses in transmission lines are mitigated, which allow the cost of real power generated to be reduced [9], [11].…”
Section: ) Transmission Systemsmentioning
confidence: 99%
See 3 more Smart Citations
“…The problems that the transmission sector of a power system face include large amounts of power loss in the transmission line which is termed as transmission line losses. This issue can be resolved by using the FPA to determine optimal placement of Flexible AC transmission system (FACTS) devices [10], [96]. In addition, optimal power flow problem in power systems, with the use of FPA along with SVC's, real power losses in transmission lines are mitigated, which allow the cost of real power generated to be reduced [9], [11].…”
Section: ) Transmission Systemsmentioning
confidence: 99%
“…Presently, the supply of electricity has decreased considerably due to unsuitable power system designs which are unable to satisfy the increasing load requirements. As a result, there is an increase in the number of private companies that assist in meeting the requirements, which would otherwise cause problems in the security of the power system, voltage fluctuations and system breakdown due to transmission line losses [10]. To solve these problems, new transmission lines are being built.…”
Section: A Transmission Line Planningmentioning
confidence: 99%
See 2 more Smart Citations
“…Researchers use Flexible AC Transmission System (FACTS) to get minimum line power losses and fuel costs with active power generator as control variables [7]. In other studies [8], Thyristor Controlled Series Capacitor (TCSC) is used as a control variable of OPF problems with the objective function of minimizing line power losses. Valve point effect of generator are taken into account in other studies [9] whose objective function is to get the minimal fuel costs.…”
Section: Introductionmentioning
confidence: 99%