2016
DOI: 10.2495/safe-v6-n3-475-484
|View full text |Cite
|
Sign up to set email alerts
|

Flood risk assessment and prioritisation of measures: two key tools in the development of a national programme of flood risk management measures in Moldova

Abstract: Following severe floods in 2008 and 2010, the Government of Moldova requested assistance to improve flood protection throughout the country. The European Investment Bank has funded a Technical Assistance project to develop a programme of flood risk management measures. The project included the detailed 2D hydraulic modelling of the high-risk rivers (about 3400 km) to produce flood hazard and flood risk maps, the identification of measures to reduce the flood risk, the prioritisation of measures and the develop… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 4 publications
(3 reference statements)
0
2
0
Order By: Relevance
“…The role of the flood risk management system, in general, is as a tool to monitor flooding in consultation with decision-makers, flood vulnerable communities, and stakeholders. Since flood risks have never been controlled, and if it is beyond the capacity to reduce flooding impacts [9], this includes practices to adapt and live with minimized flood risks. The application of flood forecasting and early warning component as part of a flood risk management system to mitigate flood impacts is feasible and less costly to implement.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The role of the flood risk management system, in general, is as a tool to monitor flooding in consultation with decision-makers, flood vulnerable communities, and stakeholders. Since flood risks have never been controlled, and if it is beyond the capacity to reduce flooding impacts [9], this includes practices to adapt and live with minimized flood risks. The application of flood forecasting and early warning component as part of a flood risk management system to mitigate flood impacts is feasible and less costly to implement.…”
Section: Introductionmentioning
confidence: 99%
“…Once the flood forecasting and modeling systems were developed, the flood early warnings can be issued to a range of users, such as (a) creating readiness for operational and flood emergencies, (b) providing early warning in time about flood impacts including locations of the event, and (c) give time to undertake evacuation and emergency procedures in case of extreme floods. To enhance and improve the flood risk management plan [9] and decision-making facilities, this case study avails a strategic flood tool that possesses a sustainable flood management system [10]. Therefore, the flood forecasting and early warning system is an economical and time-saving monitoring system using the advantage of an interactive and responsive web-based flood tool.…”
Section: Introductionmentioning
confidence: 99%