Flood risk assessment and associated uncertainty

Abstract: Abstract. Flood disaster mitigation strategies should be based on a comprehensive assessment of the flood risk combined with a thorough investigation of the uncertainties associated with the risk assessment procedure. Within the "German Research Network of Natural Disasters" (DFNK) the working group "Flood Risk Analysis" investigated the flood process chain from precipitation, runoff generation and concentration in the catchment, flood routing in the river network, possible failure of flood protection measures… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

4
352
1
9

Year Published

2008
2008
2018
2018

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 444 publications
(377 citation statements)
references
References 12 publications
(13 reference statements)
4
352
1
9
Order By: Relevance
“…Detailed information about the existing modules can be found in Apel et al (2004Apel et al ( , 2006Apel et al ( , 2008.…”
Section: Vulnerability 2 Damage Estimationmentioning
confidence: 99%
See 3 more Smart Citations
“…Detailed information about the existing modules can be found in Apel et al (2004Apel et al ( , 2006Apel et al ( , 2008.…”
Section: Vulnerability 2 Damage Estimationmentioning
confidence: 99%
“…These correlations were used to drawn randomly correlated peak discharges for Ruhr and Lippe for each peak discharge in the Rhine (cf. Apel et al, 2004).…”
Section: Tributary Inflowmentioning
confidence: 99%
See 2 more Smart Citations
“…Such assessments may be associated with significant uncertainty. For example, Merz et al (2004) quantified the uncertainty associated with flood damage estimates at the micro-scale, and Apel et al (2004Apel et al ( , 2008) assessed the uncertainty of flood risk estimates for a river reach. It is widely acknowledged that risk analyses should try to indicate the reliability of the risk quantification.…”
Section: Introductionmentioning
confidence: 99%