Day 2 Tue, September 27, 2016 2016
DOI: 10.2118/181354-ms
|View full text |Cite
|
Sign up to set email alerts
|

First Dual Zone Drillstem Test With Acoustic Telemetry Using Multiple Retrievable Packers for Single Trip Testing of Two Independent Reservoirs

Abstract: Although the main objectives of drillstem testing (DST) have remained largely unchanged over the years, operators are continuously seeking a means of improving operational efficiency (time/cost savings) while maintaining the highest level of operational standards, with safety and the environment being paramount. This paper presents a case history of the first retrievable dual packer testing string used to independently test two reservoirs in a single trip (toolstring conveyance into and out of the hole), which… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 2 publications
0
0
0
Order By: Relevance