2008
DOI: 10.1108/17410380810847954
|View full text |Cite
|
Sign up to set email alerts
|

Finite scheduling of collaborative design and manufacturing activity: a Petri net approach

Abstract: PurposeThis paper aims to present an approach of utilizing Petri net (PN) to model and schedule collaborative design and manufacturing activities at a cyber manufacturing centre (CMC).Design/methodology/approachA conceptual PN model consisting of all activities at the CMC is drafted. This model is then simplified to generate a conflict free PN for scheduling analysis purposes. Based on this simplified PN, generalized scheduling algorithms were developed. The algorithms were used in spreadsheets to process and … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
6
0

Year Published

2008
2008
2018
2018

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(6 citation statements)
references
References 12 publications
0
6
0
Order By: Relevance
“…Manufacturers are forced to provide products with high quality as well as low prices in the right time [2]. Challenges for a manufacturer in today global environment includes short product life cycle, product varieties, minimal inventories, concurrent processing of different products, short delivery times [3], well informed and demanding customer [1], mass customization, and short lived market opportunities [4]. That is why manufacturing companies need to continuously make an innovation and adapt their business to survive and meet the fast changing market environment.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Manufacturers are forced to provide products with high quality as well as low prices in the right time [2]. Challenges for a manufacturer in today global environment includes short product life cycle, product varieties, minimal inventories, concurrent processing of different products, short delivery times [3], well informed and demanding customer [1], mass customization, and short lived market opportunities [4]. That is why manufacturing companies need to continuously make an innovation and adapt their business to survive and meet the fast changing market environment.…”
Section: Introductionmentioning
confidence: 99%
“…There are several solution have been offered by some researchers for above challenges which are improving product cycles, reducing cost, communicate and work concurrently in the enterprise network [1], working together and establishing partner in a collaboration network [3], internationalisation, operate in different country or develop global strategies for operation coordination [2]. It seems that coordination of activities in a network become urgent to respond the fast changing environment [6,7].…”
Section: Introductionmentioning
confidence: 99%
“…This might mean that the enterprises have to produce small lot sizes using general purpose machines to cater larger variety of products. When such a situation is coupled with the need to address quality, taxes, green manufacturing, and delivery requirements, sustenance of the enterprise becomes difficult (Rehman et al , 2016; Bareduan et al , 2008; Mohanty et al , 2007; Seth and Tripathi, 2006; Seth et al , 2008). This type of situation results in high unit cost due to poor utilization (Bareduan et al , 2008; Wang et al , 2014).…”
Section: Introductionmentioning
confidence: 99%
“…When such a situation is coupled with the need to address quality, taxes, green manufacturing, and delivery requirements, sustenance of the enterprise becomes difficult (Rehman et al , 2016; Bareduan et al , 2008; Mohanty et al , 2007; Seth and Tripathi, 2006; Seth et al , 2008). This type of situation results in high unit cost due to poor utilization (Bareduan et al , 2008; Wang et al , 2014). Therefore, the study proposed here can become important to the manufacturing enterprises.…”
Section: Introductionmentioning
confidence: 99%
“…The recommended job sequence by using BAM3 index is therefore CFDBAE. The makespan for this sequence can be computed using the conventional start and stop time analysis corresponding to the CMC re-entrant flow shop with strict permutation rule as described by [17]. The result indicates that CFDBAE job sequence generates a makespan of 649 hours.…”
Section: P(4a) + P(5a) + P(6a)}-{p(1e) + P(2e) + P(3e)}= (12+16mentioning
confidence: 99%