1977
DOI: 10.2172/7287715
|View full text |Cite
|
Sign up to set email alerts
|

Final Safety Analysis Report (FSAR) for Building 332, Increment III

Abstract: 18 to improve the finish on the internal walls so that it will be easier to decontaminate them. *21 to match the filled floor grade by extending the sidewall drain and raising the utility ports. *23 to determine if the floor sag would decrease the floor's seismic response below. the design base seismic requirements. *24 to fill the low sections in the first floor so that the floor surface will meet the minimum design criteria for plutonium facilities. 26 to prevent contamination of the wall interiors at the wa… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles