Final design and start of manufacture of the ITER Vacuum Vessel ports

Abstract: The ITER Vacuum Vessel (VV) features upper, equatorial and lower ports. Although the port design has been overall completed in the past, the design of some remaining interfaces was still in progress and has been finalized now. As the ITER construction phase has started, the procurement of the VV ports has been launched. The VV upper ports will be procured by the Russian Federation DA, while the equatorial and lower ports will be procured by the Korean DA. The main industrial suppliers were selected and develop… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2013
2013
2023
2023

Publication Types

Select...
4
1

Relationship

2
3

Authors

Journals

citations
Cited by 5 publications
(6 citation statements)
references
References 5 publications
0
6
0
Order By: Relevance
“…These tolerances were nearly achieved on the previous full-scale mock-up manufactured by JSC Izhorskiye Zavody (St. Petersburg) [4] and it is expected that they will be achieved fully by completion of the current mock-up by MDT. Intermediate results obtained at complete inner shell (see Fig.…”
Section: Upper Port Manufacturing Progressmentioning
confidence: 85%
See 2 more Smart Citations
“…These tolerances were nearly achieved on the previous full-scale mock-up manufactured by JSC Izhorskiye Zavody (St. Petersburg) [4] and it is expected that they will be achieved fully by completion of the current mock-up by MDT. Intermediate results obtained at complete inner shell (see Fig.…”
Section: Upper Port Manufacturing Progressmentioning
confidence: 85%
“…The port structures include the full-size ports at the upper, equatorial and lower levels of the machine and additional local penetrations at the lower level [3,4]. The port components are mainly of double walled construction with single walled parts included into some ports.…”
Section: Description Of the Vv Upper Portsmentioning
confidence: 99%
See 1 more Smart Citation
“…A general overview of the ITER vacuum vessel ports is given in [1]. The port plugs to be installed on the machine are of different types (Heating and Current Drive, Diagnostics, Test Blanket Module).…”
Section: Port Plug Sealingmentioning
confidence: 99%
“…23. The contract for the manufacture of the upper ports has been recently awarded by Efremov Institute to MDT and startup activities are in progress [5]. In parallel, RF has already procured in parallel a first batch of plates and forgings.…”
Section: Full-scale Production Of Vv Portsmentioning
confidence: 99%