Final design and mock-up of an ITER sector sub-assembly tool

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 2 publications
(3 reference statements)
0
2
0
Order By: Relevance
“…This machine will be a very large device for assembling VVs, TSs, and 2 TF coils having a 40° sector; after all, it will be used to form the basic unit for the ITER tokamak machine. The subassembly sequence and the final design considering the results of the mock‐up test and the structural analysis were presented in a recent paper …”
Section: Progress Of the Iter Projectmentioning
confidence: 99%
See 1 more Smart Citation
“…This machine will be a very large device for assembling VVs, TSs, and 2 TF coils having a 40° sector; after all, it will be used to form the basic unit for the ITER tokamak machine. The subassembly sequence and the final design considering the results of the mock‐up test and the structural analysis were presented in a recent paper …”
Section: Progress Of the Iter Projectmentioning
confidence: 99%
“…The subassembly sequence and the final design considering the results of the mock-up test and the structural analysis were presented in a recent paper. 15 As a summary, 128 tools might be manufactured and delivered to IO. Conceptual design review (2009), PA (August 2009), contract (March 2010), preliminary design review (PDR for the first-batch tools, July 2011), and final design review (for the first-batch group A, December 2014) have been passed.…”
Section: Assembly Toolingmentioning
confidence: 99%