2015
DOI: 10.1109/tasc.2014.2364231
|View full text |Cite
|
Sign up to set email alerts
|

Field Quality and Mechanical Analysis of the Beam Separation Dipole for HL-LHC Upgrade

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
15
1

Year Published

2015
2015
2020
2020

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 18 publications
(16 citation statements)
references
References 2 publications
0
15
1
Order By: Relevance
“…Nevertheless, other applications are currently under investigation, such as for example high current cables (see e.g. the link project at CERN [4]), fault current limiters, transformers, motors and generators [1,5,6].…”
Section: Introductionmentioning
confidence: 99%
“…Nevertheless, other applications are currently under investigation, such as for example high current cables (see e.g. the link project at CERN [4]), fault current limiters, transformers, motors and generators [1,5,6].…”
Section: Introductionmentioning
confidence: 99%
“…The coil pre-stress at the pole at assembly is designed to be 80 MPa so that the coil is under compression at the pole even during excitation. The performed ANSYS simulations [6], [7] have not revealed any serious problem in the magnet structure.…”
Section: B Magnet Designmentioning
confidence: 99%
“…In this paper, development status of the short model as well as advancement of the fundamental design studies are presented. Detailed electromagnetic and mechanical analyses are reported in [7].…”
Section: Introductionmentioning
confidence: 99%
“…Requirements on the magnetic field are extremely high as field errors can be detrimental for the beam dynamics. As a first approach the magnetic design of superconducting accelerator magnets is usually based on numerical optimization by 2D modelling of the cross section in the transverse plane [1]. Once the cross section is designed, the coil ends are optimized separately with the objective to minimize the total field errors Automatically generated dates of receipt and acceptance will be placed here.…”
Section: Introductionmentioning
confidence: 99%