2018
DOI: 10.1016/j.tust.2018.06.018
|View full text |Cite
|
Sign up to set email alerts
|

Field measurement analysis of the influence of double shield tunnel construction on reinforced bridge

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
13
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 40 publications
(13 citation statements)
references
References 16 publications
0
13
0
Order By: Relevance
“…The FEM mesh consisted of 10,010 nodes and 9480 elements (six-and eight-node linear brick), conditioned with appropriate boundary conditions. The upper surface corresponding to the effective ground was free to move, for which the pressure induced by the self-gravity of the EPB-S machine was taken into account by applying a constant distributed load equal to 20 kPa [1,32] (additional thrust p). The interactive behavior of the shield-soil wall due to the effects of fluid injections from the shield head was conditioned with an additional friction force τ (45 kPa) [33,34].…”
Section: Applicationmentioning
confidence: 99%
“…The FEM mesh consisted of 10,010 nodes and 9480 elements (six-and eight-node linear brick), conditioned with appropriate boundary conditions. The upper surface corresponding to the effective ground was free to move, for which the pressure induced by the self-gravity of the EPB-S machine was taken into account by applying a constant distributed load equal to 20 kPa [1,32] (additional thrust p). The interactive behavior of the shield-soil wall due to the effects of fluid injections from the shield head was conditioned with an additional friction force τ (45 kPa) [33,34].…”
Section: Applicationmentioning
confidence: 99%
“…It took 5 days for shield machine to cross under the existing tunnels in upline construction, but took 8 days for downline construction. Shorter construction time is more likely to reduce the disturbance to the soil [45]. Smaller earth chamber pressure, total thrust, and grouting volume may also result in the less impact of superposition effect of the second shield crossing.…”
Section: Comparison Of the Maximum Longitudinal Settlement Ofmentioning
confidence: 99%
“…e results illustrated that pile settlement and failure mechanisms are highly dependent on the load redistribution that occurs between piles during tunnel volume loss, which are related to structure weight and stiffness. Wang et al [14] studied the construction schemes and influence of shield tunneling on reinforcing and rebuilding bridges in the case of shield tunnel of Hangzhou Metro 2 crossing through Fengqi Bridge. Sirivachiraporn and Phienwej [15] analyzed the field measurement data of the first Bangkok subway project to evaluate the ground movement characteristics and responses of adjacent buildings.…”
Section: Introductionmentioning
confidence: 99%