2005
DOI: 10.1177/0361198105193600114
|View full text |Cite
|
Sign up to set email alerts
|

Field Installation and Pullout Test of Embedded Suction Anchors

Abstract: The field installation and pullout tests of an embedded suction anchor were conducted inside the Okpo Harbor located along the southeastern coast of South Korea in 2003. The embedded suction anchor was made of steel with an outside diameter of 1.91 m, length of 2.5 m, and thickness of 3 cm. It was installed by a 9.25-m-long suction pile attached at the top of the anchor. During installation of the embedded suction anchor and retrieval of the suction pile, the water pressure inside the suction pile versus the p… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
references
References 14 publications
0
0
0
Order By: Relevance