Field experimental investigation of punch-through for different operational conditions during the jack-up rig spudcan penetration in sand overlying clay

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
4
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 17 publications
(4 citation statements)
references
References 12 publications
0
4
0
Order By: Relevance
“…In the field of large-scale modeling to simulate marine strata, there exists a pronounced demand for high-strength, saturated clay samples. In marine geotechnical engineering, the pile shoe dimensions of marine platform pile foundations vary significantly from 3 m to 60 m [1], which ensures adequate bearing capacity with soil strengths ranging from a few kPa to several tens of kPa [2]. Conventional methods for generating clay samples predominantly rely on soil consolidation from a slurry, a process that is notably protracted, particularly when aiming for higher soil strengths.…”
Section: Introductionmentioning
confidence: 99%
“…In the field of large-scale modeling to simulate marine strata, there exists a pronounced demand for high-strength, saturated clay samples. In marine geotechnical engineering, the pile shoe dimensions of marine platform pile foundations vary significantly from 3 m to 60 m [1], which ensures adequate bearing capacity with soil strengths ranging from a few kPa to several tens of kPa [2]. Conventional methods for generating clay samples predominantly rely on soil consolidation from a slurry, a process that is notably protracted, particularly when aiming for higher soil strengths.…”
Section: Introductionmentioning
confidence: 99%
“…Tae-Min Cho et al [7] performed a global in-place analysis for leg structure in the WTIV. The analysis parameters such as environmental and soil condition were induced by actual measurements at a west-south offshore wind farm in Korea.…”
Section: Introductionmentioning
confidence: 99%
“…O FFSHORE oil and gas exploration, drilling, and workover have all been done on jack-up drilling platforms for decades. In the jacking operation of a JuR, there are numerous approaches [1], [2], [3], [4] for ensuring stable control and reducing influencing forces (JuR) to the process. Even if each technique has its own set of advantages, the study of advanced control algorithms pushes researchers to develop theory and practice solutions to help the system work more consistently and securely control system and has many more operations than before.…”
Section: Introduction a Backgroundmentioning
confidence: 99%