1991
DOI: 10.1109/54.82037
|View full text |Cite
|
Sign up to set email alerts
|

Fast prototyping of datapath-intensive architectures

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
126
0
1

Year Published

1992
1992
2003
2003

Publication Types

Select...
6
2
1

Relationship

2
7

Authors

Journals

citations
Cited by 256 publications
(127 citation statements)
references
References 10 publications
0
126
0
1
Order By: Relevance
“…8j 2 [0; T r 0 1]; p 2 PS t ; t 2 PROC g i1;i2 y tl i1 ;P i2 (15) g i1;i2 y tli2;P i1 (16) g i1;i2 g i1;i + y tl i ;P i2 0 18i 2 N1 (17) g i1;i2 g i1;i + y tli2;P i 0 18i 2 N1 (18) …”
Section: Ilp Model For Processor Allocation With Unfolding Factor Minunclassified
See 1 more Smart Citation
“…8j 2 [0; T r 0 1]; p 2 PS t ; t 2 PROC g i1;i2 y tl i1 ;P i2 (15) g i1;i2 y tli2;P i1 (16) g i1;i2 g i1;i + y tl i ;P i2 0 18i 2 N1 (17) g i1;i2 g i1;i + y tli2;P i 0 18i 2 N1 (18) …”
Section: Ilp Model For Processor Allocation With Unfolding Factor Minunclassified
“…The objective of module selection is automatic allocation of each operation to a library of processors to synthesize a system using less silicon area and lower power. The module selection during scheduling has been addressed in [18]- [20] in the context of heuristic scheduling and in [14] for scheduling large-grain signal processing algorithms by ILP. In this paper we support fine-grain signal processing algorithms.…”
Section: Introductionmentioning
confidence: 99%
“…For example, the product y = 175 * x, can be computed in the following way: y = x <<7 + x << 5 + x << 4 + x << 3 + x. Since the shifts and additions are significantly more area, time, and power efficient, this transformations has been widely used in computer architecture, compilers [Mag88], and VLSI signal processing [Rab91].…”
Section: Implementation On Custom Datapath Asicsmentioning
confidence: 99%
“…3a). Under estimations, Hyper estimation for area, speed, and power is encapsulated [Rab91,Meh94], as well as property-based area estimation. A sample property-based estimation window is shown in Fig.…”
Section: Interface and Implementationmentioning
confidence: 99%